Finally we are seeing some real progress towards a completed workshop!;) The original floor was designed to cary animal waste down to a corner and out of the building. The easiest way to ensure a level floor plan is to construct a frame. On the photo to the left you can see we put down a second membrane (can’t be too careful) We have also bolted the joists to the floor with steel brackets as we don’t want any future sagging.
We also fit insulating material between the timber, leaving an air gap underneath that should prevent any moisture building up.
I’m happy to finally have a celling over my head! It will look superb once the plasterer has done it’s magic.
Next step will be fitting the electrics for the wall plugs and then putting up the insulated plasterboards. We will also be fitting a second super secure steel door behind the entrance door.