Mitka's vintage watch service.

Workshop update.

Roof insulation

The workshop build is nearing its final stage. I have painted the walls and celling, fitted the loft latch, insulated the loft, put down the flooring and the electrician has installed the lights, extractor fan and another 2o power sockets.

Painting inside.

Loft hatch installed.

Padded linoleum flooring provides me with a softer surface in the scenario I was to drop something;)

I have also fitted some lights on the outside of the building.

The front door has also got a new colour. You can also see the extractor fan vent.

 

2 / 6

I’m now waiting for the plumber and the cabinets to arrive this upcoming week.

Exit mobile version