The workshop build is nearing its final stage. I have painted the walls and celling, fitted the loft latch, insulated the loft, put down the flooring and the electrician has installed the lights, extractor fan and another 2o power sockets.
Padded linoleum flooring provides me with a softer surface in the scenario I was to drop something;)
I’m now waiting for the plumber and the cabinets to arrive this upcoming week.
