Workshop update

Hole 2

Since last update we have dug a trench and laid power cables, waste pipe and water pipe up to the workshop. I have also applied a damp-proofing membrane on the floor.

Wastepipe

The trench needed some depth to be able to get the correct angle for the waste pipe.

Digger

In the end we filled the trench with shingle.

Pipes in the ground

You can’t notice a thing:D

Teated floor

I have also put down damp-proofing membrane on the concrete floor.

Next will be fitting a new floor frame and insulation. The project will hopefully start picking up speed now:)

This entry was posted in Uncategorized. Bookmark the permalink.

4 Responses to Workshop update

  1. Brandon says:

    I’m jealous! It is looking fantastic!

    Like

  2. Bill says:

    But where will you park the Corvair? An unusual car in the states, must be one-off over there.

    Like

  3. Gary says:

    Fantastic progress! I’m anxious to see it finished and I am sure you are as well! 🙂

    Like

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s